
Pre-Construction Termite Protection
Termite protection built in from the ground up, for new builds and extensions across Perth.
The best time to protect is before you build
Adding termite protection during construction is the easiest and most cost-effective way to protect a new home. The construction of barriers can be incorporated into the structure/soil prior to the pouring of the slab, which is difficult to add later.
There are many different types of termite management that are generally required for new homes in Western Australia. We collaborate with builders and homeowners throughout Perth to apply pre-construction termite protection, as per the relevant Australian standards, whether you are building new or extending or renovating. Because the work is done before the slab and finishes are installed, the coverage can be complete and continuous in ways that simply aren't possible on an existing home.
Building new is the ideal time to lock in long-term defence and avoid the worry of hidden termite damage down the track.
What we install
- Chemical treatment of soil under and around the slab before pouring
- Structural termite barriers installed at edges of slabs and penetrations
- Reticulation systems to refill the chemical barrier when needed.
- Protection for pipe penetrations, slab edges and junction points
- Plan installation as per your builder's availability
- Documents to support building compliance.

Built-in defence for new builds
Chemical Soil Treatment
An area treated with a soil termiticide before the pouring of the concrete excludes access of hidden termites.
Physical Barriers
At the hidden areas, slabs are filled with termite mesh or graded stone to help keep termites out of slab edges and pipe penetrations.
Reticulation Systems
The pipework is installed in the soil, which lasts for many years, and the chemical zone can be refilled in the future without disturbing the slab.

Easier, cheaper and more complete
Retrofitting barriers to an existing home can be disruptive and costly. Installing protection during construction means full coverage under and around the slab, with far less disturbance.
During construction
Full access to soil and structure before the slab is poured — coverage that's hard to match later.
Less disruption
No trenching through finished gardens, paving or floors after you've moved in.
Compliance ready
Documentation to support building compliance and your own records.
Protect your Perth home from termites today
The solution to termite infestation in Perth homes is at your fingertips. Get a termite inspection or a free estimate. Our team is available around Perth and WA.
Pre-Construction Protection FAQs
Straight answers to the questions Perth homeowners ask us most.
When should pre-construction termite protection be installed?
The timing will depend on the type of barrier. Chemical soil treatment is usually done prior to pouring of the slab, while physical barriers are added to the construction process at certain phases. Coordinate with your builder for the build schedule.
Is pre-construction termite protection required in Perth?
Generally, new homes in Western Australia are required to provide some level of termite management. We install protection as per relevant Australian standards and provide documentation for your records.
Can protection be added to an extension or renovation?
Yes. We provide termite protection for extensions, renovations, and new builds, so the new work is well protected.
Do I still need inspections after pre-construction protection?
Yes. None of the barriers is a 'set and forget' type barrier. Regular inspections ensure the protection is in place and any activity is noted early.